Skip to main content

Crusoe develops Google data center campus in Armstrong County, Texas

2 companies named across 1 category, one of 58 articles referencing Crusoe. Previous coverage: AI training portals, cloud sandboxes, and security advisories - Week of September 28, 2026 (Sep 2026).

Companies mentioned

Best suited for

Seniority
C Level / Executive Team
Job function
IT Infrastructure
Persona
Platform / Infrastructure Engineer
Buyer role
Decision Maker / Budget Holder
Buyer journey
Need to Buy
Adoption curve
Early Adopters
Technology maturity
Operational Expansion
Industry
Data Center / Data Center Infrastructure / Data Center Physical Infrastructure / Liquid & Immersion Cooling

Our classification, not the publisher's statement. Best suited for, not only for.

Crusoe said it is developing Google’s data center campus under construction in Armstrong County outside of Amarillo, Texas. The company linked the project to providing capacity intended to support advanced AI, tying the site’s purpose to its energy supply.

Crusoe said the campus connects to wind generation at Serena’s adjacent Goodnight 1 and Goodnight 2 wind farms. It said surplus power from the campus is supplied back to the grid when wind generation exceeds campus demand, with the stated goal of reducing curtailment of West Texas wind energy.

Crusoe described the campus as designed to use water efficiently through a closed-loop, non-evaporative liquid cooling system. The company said the system is designed to limit the facility’s water footprint primarily to domestic uses such as kitchens.

Crusoe said construction began in June 2025 and that more than 5,500 skilled laborers worked on-site daily. It said the project is part of a West Texas portfolio that also includes two campuses under development in Abilene.

“Building the future of AI requires a new kind of infrastructure, starting with energy. Crusoe’s strategy is to build AI factories directly at the source of abundant, low-cost energy – to both improve utilization of existing assets as well as catalyze new energy generation,” said Chase Lochmiller, CEO and Co-founder of Crusoe. “The Armstrong County campus is a prime example of this energy-first strategy. We’re bringing new, affordable clean energy online. We broke ground in June 2025 and are building at the same swift pace we set in Abilene.”

Crusoe said its efforts include using the Armstrong County site’s wind connections and energy approach as part of its broader West Texas portfolio of data center campus development.

Press release, provided by Globe Newswire on behalf of Crusoe. Read the original.

Structured data (JSON-LD)

The schema.org markup this page publishes for search engines and AI agents, exactly as they read it.

[
  {
    "@context": "https://schema.org",
    "@id": "https://decisioninsights.ai/#website",
    "@type": "WebSite",
    "name": "Decision Insights",
    "potentialAction": {
      "@type": "SearchAction",
      "target": {
        "@type": "EntryPoint",
        "urlTemplate": "https://decisioninsights.ai/search/?q={search_term_string}&submit=1"
      }
    },
    "publisher": {
      "@id": "https://decisioninsights.ai/#organization"
    },
    "url": "https://decisioninsights.ai"
  },
  {
    "@context": "https://schema.org",
    "@id": "https://decisioninsights.ai/#organization",
    "@type": "Organization",
    "contactPoint": {
      "@type": "ContactPoint",
      "contactType": "customer support",
      "email": "[email protected]"
    },
    "description": "Decision Insights is a Registry of technology companies, open source projects, and industry terms, built for people and for AI agents that need sourced, structured information.",
    "logo": {
      "@type": "ImageObject",
      "url": "https://wiretap-cdn-assets.nyc3.cdn.digitaloceanspaces.com/decision-insights/[email protected]"
    },
    "name": "Decision Insights",
    "parentOrganization": {
      "@type": "Organization",
      "name": "Wiretap Labs",
      "sameAs": [
        "https://www.linkedin.com/company/wiretap-labs",
        "https://www.crunchbase.com/organization/wiretap-labs"
      ],
      "url": "https://wiretaplabs.com"
    },
    "publishingPrinciples": "https://decisioninsights.ai/standards/",
    "sameAs": [
      "https://www.linkedin.com/company/decisioninsights"
    ],
    "url": "https://decisioninsights.ai"
  },
  {
    "@context": "https://schema.org",
    "@type": "BreadcrumbList",
    "itemListElement": [
      {
        "@type": "ListItem",
        "item": "https://decisioninsights.ai",
        "name": "Decision Insights",
        "position": 1
      },
      {
        "@type": "ListItem",
        "item": "https://decisioninsights.ai/records/",
        "name": "Records",
        "position": 2
      },
      {
        "@type": "ListItem",
        "item": "https://decisioninsights.ai/crusoe-develops-google-data-center-campus-in-armstrong-county-texas/",
        "name": "Crusoe develops Google data center campus in Armstrong County, Texas",
        "position": 3
      }
    ]
  },
  {
    "@context": "https://schema.org",
    "@id": "https://decisioninsights.ai/crusoe-develops-google-data-center-campus-in-armstrong-county-texas/#blogposting",
    "@type": "NewsArticle",
    "about": {
      "@id": "https://decisioninsights.ai/registry/crusoe/#organization",
      "@type": "Organization",
      "mainEntityOfPage": "https://decisioninsights.ai/registry/crusoe/",
      "name": "Crusoe"
    },
    "articleSection": [
      "Data Center"
    ],
    "audience": [
      {
        "@type": "Audience",
        "additionalType": "Seniority",
        "audienceType": "C Level / Executive Team"
      },
      {
        "@type": "Audience",
        "additionalType": "Job function",
        "audienceType": "IT Infrastructure"
      },
      {
        "@type": "Audience",
        "additionalType": "Persona",
        "audienceType": "Platform / Infrastructure Engineer"
      },
      {
        "@type": "Audience",
        "additionalType": "Buyer role",
        "audienceType": "Decision Maker / Budget Holder"
      },
      {
        "@type": "Audience",
        "additionalType": "Adoption curve",
        "audienceType": "Early Adopters"
      },
      {
        "@type": "Audience",
        "additionalType": "Technology maturity",
        "audienceType": "Operational Expansion"
      },
      {
        "@type": "Audience",
        "additionalType": "Industry",
        "audienceType": "Data Center / Data Center Infrastructure / Data Center Physical Infrastructure / Liquid & Immersion Cooling"
      }
    ],
    "author": {
      "@id": "https://decisioninsights.ai/author/decision-insights-signals/#person",
      "@type": "Person",
      "name": "Decision Insights Record",
      "url": "https://decisioninsights.ai/author/decision-insights-signals/"
    },
    "dateModified": "2026-09-28T16:25:51-06:00",
    "datePublished": "2026-09-28T16:25:46-06:00",
    "description": "Crusoe said it is developing Google’s data center campus in Armstrong County, Texas, with access to adjacent wind generation and liquid cooling.",
    "headline": "Crusoe develops Google data center campus in Armstrong County, Texas",
    "isBasedOn": {
      "@type": "CreativeWork",
      "sourceOrganization": {
        "@type": "Organization",
        "name": "GlobeNewswire"
      },
      "url": "https://www.globenewswire.com/news-release/2026/09/28/3370313/0/en/crusoe-developing-data-center-campus-in-armstrong-county-texas.html"
    },
    "mainEntityOfPage": {
      "@id": "https://decisioninsights.ai/crusoe-develops-google-data-center-campus-in-armstrong-county-texas/",
      "@type": "WebPage",
      "sdDatePublished": "2026-09-28",
      "sdPublisher": {
        "@id": "https://decisioninsights.ai/#organization"
      }
    },
    "mentions": [
      {
        "@id": "https://decisioninsights.ai/registry/armstrong/#organization",
        "@type": "Organization",
        "mainEntityOfPage": "https://decisioninsights.ai/registry/armstrong/",
        "name": "Armstrong"
      },
      {
        "@id": "https://decisioninsights.ai/registry/crusoe/#organization",
        "@type": "Organization",
        "mainEntityOfPage": "https://decisioninsights.ai/registry/crusoe/",
        "name": "Crusoe"
      }
    ],
    "publisher": {
      "@id": "https://decisioninsights.ai/#organization"
    }
  },
  {
    "@context": "https://schema.org",
    "@id": "https://decisioninsights.ai/author/decision-insights-signals/#person",
    "@type": "Person",
    "description": "Press releases and independent analyst research, structured into concise summaries for research and monitoring. Produced under our Standards & Methodology.",
    "name": "Decision Insights Record",
    "sameAs": [
      "https://www.linkedin.com/showcase/decisioninsights/"
    ],
    "url": "https://decisioninsights.ai/author/decision-insights-signals/"
  }
]

Is this your company? Get structured data for your own pages